warwickhughes.com
Adelaide power price booms as interconnector fails
“At 1114 hrs(26Apr18) the South East Substation to Tailem Bend Substation No.1 275 kV Line and the South East Substation No.1 SVC tripped.” See AEMO Market Notice 62496. About 400MW was…